It is an ignominious end for a ship that served in the Royal Navy from 1973 to 2005, and took part in the Falklands, Balkans and Iraq wars before being.
See the original post here:
Meet DSN's Newest Vessel: The Aircraft Carrier HMS Invincible …
It is an ignominious end for a ship that served in the Royal Navy from 1973 to 2005, and took part in the Falklands, Balkans and Iraq wars before being.
See the original post here:
Meet DSN's Newest Vessel: The Aircraft Carrier HMS Invincible …
Airbus is coming under pressure from Emirates to increase the capability of its largest A350 variant.
Read more:
GE Engine Could Help Boost A350-1000 | AVIATION WEEK
Aircraft Carrier for Sale on Internet Auction Site. By John Farrier in Society & Culture, Weapons & War on Nov 29, 2010 at 3:34 pm. HMS Invincible of the Royal Navy (UK) served Britain starting in 1980, including combat action during …
Read the original here:
Aircraft Carrier for Sale on Internet Auction Site
Capt. Nathaniel Davis, deputy area engineer for the US Army Corps of Engineers Europe District’s Israel Area Office, speaks during a ribbon-cutting ceremony for the Nevatim Air Force Base Fuel Station in Israel. The $7 million project, …
See the article here:
USACE, defense ministry celebrate completion of aviation fuel …
The aviation insurance market is showing signs of softening despite this year being on track as one of the costliest loss years in history, according to a report from Aon Risk Solutions.
The rest is here:
Aviation Insurance Losses Grow As Market Turns Soft – Commercial …
As for the idea that pressure changes will cause light aircraft pilots to fall out of the sky like bats, this seems unlikely. According to Baerwald, the zone around the blade tips in which pressure suddenly drops is only a metre or so …
Continue reading here:
Club Troppo » Can wind farms make light aircraft pilots fall out …

In the 15 days since ZA002, Boeing’s second of six 787 flight test aircraft, suffered a fire in its aft electrical equipment bay, forcing a fleet-wide halt in certification testing,
Boeing says its first 787 delivery will slide due to software and minor hardware changes to the electrical system, an assessment the company says will be completed within “the next few weeks.”
The airframer needs to implement changes to the software that manages and protect power distribution on the aircraft, as well as a minor hardware change to the P100 distribution panel to prevent foreign object debris (FOD) ingestion.
“We have successfully simulated key aspects of the on-board event in
our laboratory and are moving forward with developing design fixes,”
says 787 vice president and general manager Scott Fancher
Boeing says foreign debris “most likely” caused the November 9 fire aboard ZA002 that has halted 787 certification operations.
The company adds that “engineers have determined the fault began as either a short circuit or an electrical arc in the P100 power distribution panel” which sits against the left wall of the 787′s aft electronic equipment bay and manages power generated by the aircraft’s left engine.
Randy Tinseth, Boeing vice president of marketing, says: “Whatever this foreign debris was, it wasn’t something big – such as a tool – it was probably something small. We’re taking the right steps to ensure the power distribution panels are better protected against foreign debris.”
Boeing says it remains unsure how the FOD got into the P100 panel in the first place, and could have been in the panel for sometime, though the company concedes it won’t know how it got there.
As for the six grounded flight test aircraft, Boeing has not yet determined whether or not the design changes would have to be implemented before resuming certification activities, saying only: “Boeing is developing a plan to enable a return to 787 flight test activities and will present it to the US Federal Aviation Administration (FAA) as soon as it is complete.”
In the interim, Boeing will continue ground testing the fleet and may ferry ZA003 from Everett to Boeing Field in the near future.
Boeing says it is now “assessing the time required to complete the design changes and software updates that are being developed.”
Here is the original post:
Breaking: Electrical redesign to push 787 first delivery (Update3)
Su-25 Attack Aircraft . … SENIOR MEMBERS. Sri Lankan’s Avatar. Join Date: Aug 2009. Location: Colombo. Posts: 4882. Countries: Thanks: 12. Thanked 2684 Times in 1282 Posts. Post Su-25 Attack Aircraft …
View post:
Su-25 Attack Aircraft
JOIN INDIAN AIR FORCE â “ BECOME AN AIRMAN RECRUITMENT RALLY FOR GROUP â ËœXâ â„¢ (TECHNICAL) TRADES AND GROUP â ËœYâ â„¢&Aci…
Here is the original post:
RECRUITMENT: Indian Air Force Recruitment Rally at Barrackpore …